​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Have you ever worked with variables? Algebra is a branch of mathematics that specifically deals with the idea of using variables to solve problems. What kinds o
Correct the sentence: Me and My friends went to Bambi.
Imagine you could have any superpower you can think of.What do you choose and how would you use it ? (examples : teleportation,telpathie,flight...)
A case holds 24 items. If 11 are removed, how many items are left?
2 angles in a tringle add up to 115 degrees what is the size of the thrid angle #
In a certain recipe that produces enough for 8 servings, 1/2 cup of sugar is required. If you were asked to expand this recipe so that it could serve 26 people,
how to get -2(t+2)+5=6t+11
what force do scientist think is responsible for matter clumping together
Which river crossed a silk road at baghdad?
Industry in America was postponed by the War of 1812? True. False.