katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

Dawn is selecting an alternative processing facility for her organization's primary data center. she would like to have a facility that balances cost and switch
Need help on all of these I don't understand
Jason drove 4/5 of the way to his destination if he drove 480 miles what is his total distance of his trip
Amber has begun to cry when she is dropped off at daycare. This development likely occurred at what age? A. One year old B. Two years old C. Three years old D.
A wave with low energy will also have
How many types of infinitives are there in Spanish
Why was Yip Harburg relieved when the stock market crashed?
How is a blood pressure reading affected if a wide adult cuff is used on a small child? blood pressure readings will be higher?
How can citizens contribute to a democratic society
There are many different types of scientific investigations. Which of the following forms requires the identification and control of variables? A. observati