lopeziris3447 lopeziris3447
  • 01-03-2022
  • Computers and Technology
contestada

A CPU scheduler that assigns higher priority to the I/O-bound processes than the CPU-bound processes causes:

Respuesta :

AliMay050
AliMay050 AliMay050
  • 01-03-2022

Answer:

Low CPU utilization and high I/O utilization

Explanation:

Answer Link

Otras preguntas

Two subway stops are separated by 1.1 km. If a subway train accelerates at +1.2 m/s2 from rest through the first half of the distance and decelerates at −1.2 m
Hi! I dont want to be billed and i have already cancelled my subscription, how can I get a refund for this?
Which of the statements below best describes the following reaction? HCl(aq) + KOH(aq) -> KCl(aq) + H2O(l)a. Hydrochloric acid and potassium hydroxide soluti
What occurs when a substance reacts with oxygen to form water and carbon dioxide? Explain
what are the benefits of waterforms and landforms in Hong Kong?
A bag contains the red marbles, we orange marbles, one yellow marble, and two green marbles. Two marbles are drawn from the bag What is the approximate probabil
(b) dy/dx = (x-y + 1)^2
The first line of cellular defense against pathogens are the
Choose the equation that represents a line that passes through points (−1, 2) and (3, 1).
Your teacher gives you an assignment to create a video on 1950s Cold War events. You decide you want to include a collage of Cold War-era propaganda. Considerin