kelvinkibalama kelvinkibalama
  • 02-03-2022
  • Business
contestada

what is changing risk​

Respuesta :

pompomsquad33 pompomsquad33
  • 02-03-2022

Answer:

here:

Explanation:

A change risk is the probability that a change program will not reach its stated objectives and goals. There is a wide range of factors that will increase the change risk for a project, and so it is important to conduct an effective risk change assessment to understand, document, and reduce these change risks.

Answer Link

Otras preguntas

Albert drew a scale drawing of a county park. The scale he used was 7 inches : 4 yards. The actual width of the picnic area is 64 yards. How wide is the picnic
Select the four things that influence intelligence.
a number subtracted from 18 is equal to the quotient of 180 and -9.
List all parts and structures from which hair grows
What is the magnitude of the acceleration of an electron that is 1.3 cm from the center of the bead?
16x−8=14x+14 can someone help
12x-4+17x+8 i do not know how to do this
In a survey of zoom animals, for out of five monkeys preferred very ripe.What is this result as a percent?
A theory has been rigorously tested. True False
XYZ Corp. has issued $30 million of debentures. Each bond issued has a warrant attached enabling the holder to buy three shares of XYZ common at $30 per share.