agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

Why do plants and animals adapt to their environment? to protect themselves against other animals to become better able to survive in their surroundings all of
Which symbol makes the comparisons true ? Complete the comparison -6 ? 3
The cone shaped roof has the height of 30ft and the radius of 15ft find it's lateral area and the surface area
locations on earth where significant hominid fossil finds occur
Find a linear equation with two variables that, together with the equation 10x + 5y = 1, would comprise a system with one solution
In ΔNOP,the measure of ∠P=90°, NP = 16, ON = 65, and PO = 63. What ratio represents the cosecant of ∠N?
explain how the models in questions 4 and 5 are the same
find the total surface area of this triangular prism answer quick
Why is an enzyme in a chemical reaction like a lock and key? A. The active site and the substrate fit perfectly together, and when they do, they unlock the chem
QUESTION * Differentiate between early and modern cartography