Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

A golf ball is hit from a hill, and its height can be modeled by h(t)= -16 + 32t + 48, where he is the height in feet and is the time in seconds. How long will
June 23. Received a $48,000, 90-day, 8% note dated June 23 from Radon Express Co. on account. Sept. 21. The note is dishonored by Radon Express Co. Oct. 21. Rec
If a boy blows 18 bubbles.Then pops 6 eats 7 and then he pops and blows 1. How many are left?
Why do we need gametes?
Mandisa is under an extreme amount of stress. she is battling with her ex-husband about money and their children. in this time of stress, mandisa turns to her f
Read the following prompt and question and answer the 4-point Constructed Response (narrative) that follows: Prompt: Just like Huck Finn experienced the conflic
Each aminoacyl trna synthetase is specific for one amino acid and a small number of trnas. True or False
What did the Embargo Act do?
The petronas towers in Kuala Lumpur, Malaysia, are 452 meters tall. A woman who is 1.75 meters tall stands 120 meters from the base of one tower. Find the angle
1. Which checking account do you think Cary should open? Why?